[1]. Ezeldin, A. S., & Abdel-Ghany, M. (2013). Causes of construction delays for engineering projects: An Egyptian perspective. In AEI 2013: Building solutions for architectural engineering (pp. 54-63).
[2]. Abd El-Razek, M. E., Bassioni, H. A., & Mobarak, A. M. (2008). Causes of delay in building construction projects in Egypt. Journal of construction engineering and management, 134(11), 831-841.
[3]. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357.
[4]. Famiyeh, S., Amoatey, C. T., Adaku, E., & Agbenohevi, C. S. (2017). Major causes of construction time and cost overruns. Journal of Engineering, Design and Technology.
[5]. Samarghandi, H., Mousavi, S., Taabayan, P., Mir Hashemi, A., & Willoughby, K. (2016). Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran.
[6]. Kholif, W., Hosny, H., & Sanad, A. (2013). Analysis of time and cost overruns in educational building projects in Egypt. International Journal of Engineering and Technical Research, 1(10), 1-8.
[7]. Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of advanced research, 5(1), 49-55.
[8]. Tilahun, S. (2016). Cause and Effects of Delay on Educational Building Projects in Addis Ababa University Case Study.
[9]. Tawil, N. M., Khoiry, M. A., Arshad, I., Hamzah, N., Jasri, M. F., & Badaruzzaman, W. H. W. (2013). Factors contribute to delay project construction in higher learning education case study UKM. Research Journal of Applied Sciences, Engineering and Technology, 5(11), 3112-3116.
[10]. Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371-381.
[11]. Susanti, R. (2020, January). Cost overrun and time delay of construction project in Indonesia. In Journal of Physics: Conference Series (Vol. 1444, No. 1, p. 012050). IOP Publishing.
[12]. Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. S. (2019). Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), 216-238.
[13]. Johnson, R. M., & Babu, R. I. I. (2020). Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management, 20(5), 402-411.
[14]. Ahmad, S. A., Issa, U. H., Farag, M. A., & Abdelhafez, L. M. (2013). Evaluation of risk factors affecting time and cost of construction projects in Yemen. International journal of management, 4(5), 168-178. Vince A, Pine WJ, Lum P. The Bailey method—achieving volumetric and HMA compatibility. Course Materials and Handouts (2009)