[1] Mahdi, I. M., Riley, M. J., Fereig, S. M., & Alex, A. P. (2002). A multi‐criteria approach to contractor selection. Engineering, construction and architectural management, 9(1), 29-37.
[2] Ansah, N. B., Aidoo, I., & Agbevade, J. (2023). Assessment of Environmental Knowledge: The Case of the Ghanaian Contractor. In Technological Innovation Driving Sustainable Entrepreneurial Growth in Developing Nations (pp. 350-363). IGI Global.
[3] United Nations Department of Economic and Social Affairs. (2023). the sustainable development goals report 2016. UN.
[4] Lima, L., Trindade, E., Alencar, L., Alencar, M., & Silva, L. (2021). Sustainability in the construction industry: A systematic review of the literature. Journal of Cleaner Production, 289, 125730.
[5] Jiang, J., He, Z., & Ke, C. (2023). Construction contractors’ carbon emissions reduction intention: a study based on structural equation model. Sustainability, 15(14), 10894.
[6] Falana, J., Osei-Kyei, R., & Tam, V. W. (2023). Towards achieving a net zero carbon building: A review of key stakeholders and their roles in net zero carbon building whole life cycle. Journal of Building Engineering, 108223.
[7] Albino, V., & Berardi, U. (2012). Green buildings and organizational changes in Italian case studies. Business strategy and the Environment, 21(6), 387-400.
[8] Shan, M., Liu, W. Q., Hwang, B. G., & Lye, J. M. (2020). Critical success factors for small contractors to conduct green building construction projects in Singapore: identification and comparison with large contractors. Environmental Science and Pollution Research, 27(8), 8310-8322.
[9] Zavadskas, E. K., Vilutienė, T., Turskis, Z., & Šaparauskas, J. (2014). Multi-criteria analysis of Projects’ performance in construction. Archives of civil and mechanical engineering, 14, 114-121.
[10] Oyegoke, A. S., & Al Kiyumi, N. (2017). The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), 286-302.
[11] Powmya, A., Abidin, N. Z., & Azizi, N. S. M. (2023). Determination of contractor strategies in delivering construction projects in Oman. Journal of Construction in Developing Countries, 28(1), 293-316.
[12] Jain, S., Jauhar, S. K., & Piyush. (2024). A machine-learning-based framework for contractor selection and order allocation in public construction projects considering sustainability, risk, and safety. Annals of Operations Research, 1-43.
[13] El-Sayegh, S. M., Basamji, M., Haj Ahmad, A., & Zarif, N. (2021). Key contractor selection criteria for green construction projects in the UAE. International Journal of Construction Management, 21(12), 1240-1250. Green construction
[14] Asaad, A., & El-Sayegh, S. M. (2021). Key criteria for selecting green suppliers for construction projects in the UAE. Journal of Financial Management of Property and Construction, 26(2), 201-218.
[15] Gu, J., Guo, F., Peng, X., & Wang, B. (2023). Green and sustainable construction industry: A systematic literature review of the contractor’s green construction capability. Buildings, 13(2), 470.
[16] Acheamfour, V. K., Adjei-Kumi, T., & Kissi, E. (2023). Contractor selection: a review of qualification and pre-qualification systems. International Journal of Construction Management, 23(2), 338-348.
[17] Khoso, A. R., & Md Yusof, A. (2020). Extended review of contractor selection in construction projects. Canadian Journal of Civil Engineering, 47(7), 771-789.
[18] Khoso, A. R., Yusof, A. M., Chen, Z. S., Skibniewski, M. J., Chin, K. S., Khahro, S. H., & Sohu, S. (2022). Comprehensive analysis of state-of-the-art contractor selection models in construction environment-A critical review and future call. Socio-Economic Planning Sciences, 79, 101137.
[19] Kog, F., & Yaman, H. (2014). A Meta classification and analysis of contractor selection and prequalification. Procedia Engineering, 85, 302-310.
[20] Acheamfour, V. K., Kissi, E., Adjei-Kumi, T., & Adinyira, E. (2020). Review of empirical arguments on contractor pre-qualification criteria. Journal of Engineering, Design and Technology, 18(1), 70-83.
[21] Hanelt, A., Bohnsack, R., Marz, D., & Antunes Marante, C. (2021). A systematic review of the literature on digital transformation: Insights and implications for strategy and organizational change. Journal of management studies, 58(5), 1159-1197.
[22] Danese, P., Manfè, V., & Romano, P. (2018). A systematic literature review on recent lean research: state‐of‐the‐art and future directions. International Journal of Management Reviews, 20(2), 579-605.
[23] Vrontis, D., & Christofi, M. (2021). R&D internationalization and innovation: A systematic review, integrative framework and future research directions. Journal of Business Research, 128, 812-823.
[24] Persson, U. (2009). Management of sustainability in construction works. Lund University.
[25] Lorenz, D., Lützkendorf, T., 2011. Sustainability and property valuation: systematisation of existing approaches and recommendations for future action. J. Property Investment Finance 29 (6), 644- 676.
[26] Lélé, S. M. (1991). Sustainable development: a critical review. World development, 19(6), 607-621.
[27] Halliday, S. (2008). Sustainable construction. Routledge.
[28] Gallopín, G. C. (2003). A systems approach to sustainability and sustainable development (Vol. 64). United Nations Publications.
[29] Guido, A., Farzaneh, H., & Guo, J. (2012). Social Actions of Strategic Sustainable Development.
[30] Laosirihongthong, T., Samaranayake, P., & Nagalingam, S. (2019). A holistic approach to supplier evaluation and order allocation towards sustainable procurement. Benchmarking: An International Journal, 26(8), 2543-2573. Sustainable procurement
[31] Borujeni, M. P., & Gitinavard, H. (2017). Evaluating the sustainable mining contractor selection problems: An imprecise last aggregation preference selection index method. Journal of Sustainable Mining, 16(4), 207-218.
[32] Gurgun, A. P., & Koc, K. (2020). Contractor prequalification for green buildings—evidence from Turkey. Engineering, Construction and Architectural Management, 27(6), 1377-1400.
[33] Parsa, M., Taheri, S., & Taheri, S. (2018). Employing multiple criteria decision making to evaluate HSE performance of contractor's case study: Lorestan Province Gas Company. In Proceedings of the International Conference on Industrial Engineering and Operations Management.
[34] Luong-Duc, L., & Do-Duy, L. (2023, July). Using “Choosing by Advantages” Method to Select Contractor for Design and Build Projects Toward Sustainable Construction. In The International Conference on Sustainable Civil Engineering and Architecture (pp. 690-699). Singapore: Springer Nature Singapore.
[35] Cai, J., Li, Z., Dou, Y., Teng, Y., & Yuan, M. (2023). Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: A developer satisfaction perspective. Engineering, Construction and Architectural Management, 30(10), 5073-5108.
[36] Christhia, M. L., Khair, F., & Saputro, H. W. (2023). Optimizing Civil Contractor Selection for Sustainable Community Maintenance Projects Using Open Tender Systems. In E3S Web of Conferences (Vol. 426, p. 01079). EDP Sciences.
[37] El-Sayegh, S. M., AbdRaboh, T., Elian, D., ElJarad, N., & Ahmad, Y. (2022). Developing a bi-parameter bidding model integrating price and sustainable construction practices. International Journal of Construction Management, 22(11), 2191-2198.
[38] Gao, G. X. (2018). Sustainable winner determination for public-private partnership infrastructure projects in multi-attribute reverse auctions. Sustainability, 10(11), 4129.
[39] Liu, B., Yang, X., Huo, T., Shen, G. Q., & Wang, X. (2017). A linguistic group decision-making framework for bid evaluation in mega public projects considering carbon dioxide emissions reduction. Journal of Cleaner Production, 148, 811-825.
[40] Setiawan, H., Ervianto, W. I., & Han, A. L. (2019, June). Green Construction Capability Model (GCCM) for Contracting Companies. In IOP Conference Series: Earth and Environmental Science (Vol. 290, No. 1, p. 012159). IOP Publishing.
[41] Singh, P., & Ruparathna, R. (2020). Construction project proposal evaluation under uncertainty: A fuzzy-based approach. Canadian Journal of Civil Engineering, 47(3), 291-300.
[42] Yan, L., Ye, K., & Jiang, W. (2015). Sustainable construction indicators: An examination of clients’ requirements in tender documents. In ICCREM 2015 (pp. 380-388).
[43] Yan, M. R. (2015). Project-based market competition and policy implications for sustainable developments in building and construction sectors. Sustainability, 7(11), 15423-15448.
[44] Wirahadikusumah, R. D., & Ario, D. (2015). A readiness assessment model for Indonesian contractors in implementing sustainability principles. International Journal of Construction Management, 15(2), 126-136.
[45] Liao, P. C., Tsenguun, G., & Liang, L. W. (2016). Development of social responsibility evaluation framework of construction projects: a multi-stakeholder's perspective. Procedia Engineering, 145, 234-241.
[46] Tayeh, B. A., Durdyev, S., Abuzuhri, I. O., Hosseini, M. R., & Thurnell, D. (2019). Contractors' attitudes towards the factors affecting sustainability performance: Evidence from Palestine. Business Strategy & Development, 2(3), 173-179.
[47] Xia, B., Chen, Q., Xu, Y., Li, M., & Jin, X. (2015). Design-build contractor selection for public sustainable buildings. Journal of management in engineering, 31(5), 04014070.
[48] GURGUN, A. P., & OZBEK, M. E. (2017). FACTORS AFFECTING THE SELECTION OF CONTRACTORS IN GREEN BUILDING PROJECTS
[49] Shamsuddin Sabri, I., & Aziz, R. A. (2021, February). Towards Better Contractor Performance to Achieve Sustainable Road Project Development. In IOP Conference Series: Earth and Environmental Science (Vol. 641, No. 1, p. 012017).
[50] Zhao, L., Liu, W., & Wu, Y. (2020). Bid evaluation decision for major project based on analytic hierarchy process and data envelopment analysis cross-efficiency model. Journal of Ambient Intelligence and Humanized Computing, 11, 3639-3647.
[51] Ahn, C., Peña-Mora, F., Lee, S., & Arboleda, C. A. (2013). Consideration of the environmental cost in construction contracting for public works: A+ C and A+ B+ C bidding methods. Journal of Management in Engineering, 29(1), 86-94.
[52] Hsueh, S. L., & Yan, M. R. (2013). A multimethodology contractor assessment model for facilitating green innovation: the view of energy and environmental protection. The Scientific World Journal, 2013(1), 624340.
[53] Amoako Sarpong, F., Kissi, E., Acheamfour, V. K., Abu, I. M., & Eluerkeh, K. (2023). Establishing the Economic Sustainability Criteria for Assessing Tenders in the Procurement of Building Works. Public Works Management & Policy, 1087724X231221432.
[54] Cao, Q., Esangbedo, M. O., Bai, S., & Esangbedo, C. O. (2019). Grey SWARA-FUCOM weighting method for contractor selection MCDM problem: A case study of floating solar panel energy system installation. Energies, 12(13), 2481.
[55] Zhou, W., Liu, M., & Xu, Z. (2021). Evolutionary computation of the generalized hesitant fuzzy envelopment analysis and its application in the contractor selection of green building project. IEEE Transactions on Engineering Management, 70(10), 3622-3636.
[56] Xia, B., Skitmore, M., Zuo, J., Zhao, Z., & Nepal, M. (2014). Defining sustainability requirements for design-build (DB) contractor selection in public sector projects. In Proceedings of the 18th International Symposium on Advancement of Construction Management and Real Estate (pp. 59-66). Springer Berlin Heidelberg.
[57] Naji, K. K., Gunduz, M., & Falamarzi, M. H. (2022). Assessment of construction project contractor selection success factors considering their interconnections. KSCE Journal of Civil Engineering, 26(9), 3677-3690.
[58] Ulubeyli, S., Kazaz, A., & Arslan, V. (2017). A structured selection process for small and medium enterprises in construction industry: case of international projects. Periodicals of engineering and natural sciences, 5(3).
[59] Husin, A. E., Soehari, T. D., & Prabowo, Y. S. (2019). Analytical hierarchy process (AHP) implementation in determining document evaluation criteria of post qualification E-tendering knockout phase. Int J Eng Adv Technol, 8(6), 160-165.
[60] Zainuddin, A., Setiawan, A. D., & Hidayatno, A. (2021, May). A Conceptual Model for Contractor Assessment System in the Electricity Project with Tender. In Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering (pp. 458-463).
[61] Khoso, A. R., Yusof, A. M., Khahro, S. H., Abidin, N. I. A. B., & Memon, N. A. (2022). Automated two-stage continuous decision support model using exploratory factor analysis-MACBETH-SMART: an application of contractor selection in public sector construction. Journal of Ambient Intelligence and Humanized Computing, 1-31.
[62] Dissanayake, N., Xia, B., Skitmore, M., Trigunarsyah, B., & Menadue, V. (2023). Ranked generic criteria for EPC contractor selection. Engineering, Construction and Architectural Management, 30(10), 4933-4954.
[63] Sun, S., Zhou, S., & Zhao, X. (2013). Analysis of Construction contractor selection and evaluation based on AHP and GRA. In ICCREM 2013: Construction and Operation in the Context of Sustainability (pp. 36-44).
[64] Polat, G. (2016). Subcontractor selection using the integration of the AHP and PROMETHEE methods. Journal of Civil Engineering and Management, 22(8), 1042-1054.
[65] Acheamfour, V. K., Kissi, E., & Adjei-Kumi, T. (2019). Ascertaining the impact of contractors' pre-qualification criteria on project success criteria. Engineering, Construction and Architectural Management, 26(4), 618-632.
[66] Kog, F., & Yaman, H. (2016). A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), 709-726. Simulation
[67] Okereke, R. A., Pepple, D. I., & Ihekweme, N. M. (2022). Assessment of the major contractors’ selection criteria and their impacts in civil engineering construction projects. ITEGAM-JETIA, 8(36), 4-13.
[68] Niewerth, S., Vogt, P., & Thewes, M. (2022). Tender evaluation through efficiency analysis for public construction contracts. Frontiers of Engineering Management, 1-11.
[69] Beljkas, Z., Prascevic, Z., Ivanisevic, N., Knezevic, M., & Cvetkovska, M. (2019). Application of fuzzy logic on selection of contractors for construction of high rise buildings. In IOP Conference Series: Earth and Environmental Science (Vol. 222, No. 1, p. 012021). IOP Publishing.
[70] Kasabreh, N. S. S., & Tarawneh, S. A. (2021). Investigating the impact of contractor’s performance on the success of Jordanian residential construction projects. International journal of construction management, 21(5), 468-475.
[71] Morkunaite, Z., Podvezko, V., Zavadskas, E. K., & Bausys, R. (2019). Contractor selection for renovation of cultural heritage buildings by PROMETHEE method. Archives of Civil and Mechanical Engineering, 19, 1056-1071.
[72] Morkūnaitė, Ž. (2019). Selection criteria for evaluating contractors of sgraffito technique in cultural heritage buildings.
[73] Morkūnaitė, Ž. Podvezko, V., & Kutut, V. (2017). Selection criteria for evaluating contractors of cultural heritage objects. Procedia Engineering, 208, 90-97.
[74] Fawzy, M. M., Elsharkawy, A. S., Khalifa, Y. A., & Hassan, A. A. (2024). Contractor selection by using multi-criteria decision-making for Egyptian road maintenance. International Journal of System Assurance Engineering and Management, 1-15.
[75] Hasnain, M., Thaheem, M. J., & Ullah, F. (2018). Best value contractor selection in road construction projects: ANP-based decision support system. International Journal of Civil Engineering, 16, 695-714.
[76] Marović, I., Perić, M., & Hanak, T. (2021). A multi-criteria decision support concept for selecting the optimal contractor. Applied Sciences, 11(4), 1660.
[77] Özyürek, İ., & Erdal, M. (2023). Crisp and fuzzy appraisal of tenderer’s qualifications in public works procurement in Turkey. Journal of Public Procurement, 23(1), 78-99.
[78] Alptekin, O., & Alptekin, N. (2017, October). Analysis of criteria influencing contractor selection using TOPSIS method. In IOP conference series: materials science and engineering (Vol. 245, No. 6, p. 062003). IOP Publishing.
[79] Bergman, M. A., & Lundberg, S. (2013). Tender evaluation and supplier selection methods in public procurement. Journal of purchasing and supply management, 19(2), 73-83.
[80] Lundberg, S., & Bergman, M. A. (2017). Tendering design when price and quality is uncertain. International Journal of Public Sector Management, 30(4), 310-327.
[81] Özyürek, İ., & Erdal, M. Ü. R. S. E. L. (2022). Solution Proposals based on Fuzzy AHP-TOPSIS Hybrid Model to the Problems in Public Works Procurement in Turkey. Turkish Journal of Civil Engineering, 34(1), 153-166.
[82] Aydın, D., & Mıhlayanlar, E. (2022). Determination of the significance of project delivery attributes (PDAs) on sustainable projects in Turkey. Journal of Engineering, Design and Technology, (ahead-of-print).